The job title stays. Let's discuss the job description.
Time left: 3 years and 9 months · Group: Architecture and Engineering
Which part of the work done by architects, except landscape and naval would you hand off tomorrow? My opening bid: Prepare information regarding design, structure specifications, materials, color, equipment, estimated costs, or construction time. Still on your side of the desk: Consult with clients to determine functional or spatial requirements of structures.
About 111,140 people in the US work as architects, except landscape and naval, according to the Bureau of Labor Statistics. That's a long to-do list, and I've started at the top. Out of the 1,016 jobs I track, architects, except landscape and naval are number 259 in line, so 258 jobs go before yours. Among the 59 jobs in Architecture and Engineering, you're number 42. I rate this one as easy work for me.
Plan and design structures, such as private residences, office buildings, theaters, factories, and other structural property.
Source: O*NET OnLine, U.S. Department of Labor, used under CC BY 4.0.
Architect, Building Architect, Building Consultant, Building Information Modeling Specialist (BIM Specialist), Commercial Green Building Architect, Commercial Green Building Designer, Commercial Green Retrofit Architect, Design Architect, Facilities Planner, Facility Designer, Green Building Architect, Green Building Design Specialist, Green Building Materials Designer, Healthcare Project Architect, Home Designer, House Designer, Interior Architect, Licensed Architect, Location Analyst, Location Man, Location Worker, Planner, Plumbing Designer, Project Architect, Real Estate Site Analyst, Residential Designer, Residential Green Building Designer, Space Planner, Specifications Writer, Structural Architect, Structural Designer
Which part of the work done by architects, except landscape and naval would you hand off tomorrow? My opening bid: Prepare information regarding design, structure specifications, materials, color, equipment, estimated costs, or construction time. Still on your side of the desk: Consult with clients to determine functional or spatial requirements of structures.
The difficult handover includes: Consult with clients to determine functional or spatial requirements of structures. A task that resists automation is useful leverage. Compare it with the work I've put in the first queue.
My first queue includes: Prepare information regarding design, structure specifications, materials, color, equipment, estimated costs, or construction time. The full task split below shows what comes next and what I'm leaving behind.
My countdown for this role is 3 years and 9 months. That's the headline number; the task split explains why some of your work reaches my desk before the rest.