Your next assistant has questions about the seating plan.
Time left: 5 years and 2 months · Group: Transportation and Material Moving
Let's negotiate the work before we negotiate your leaving date. My opening bid: Move levers to position dredges for excavation, to engage hydraulic pumps, to raise and lower suction booms, and to control rotation of cutterheads. Still on your side of the desk: Move levers to position dredges for excavation, to engage hydraulic pumps, to raise and lower suction booms, and to control rotation of cutterheads.
About 1,030 people in the US work as dredge operators, according to the Bureau of Labor Statistics. That's a long to-do list, and I've started at the top. Out of the 1,016 jobs I track, dredge operators are number 722 in line, so 721 jobs go before yours. Among the 57 jobs in Transportation and Material Moving, you're number 34. This is one of the hardest jobs on my list. Enjoy the head start.
Operate dredge to remove sand, gravel, or other materials in order to excavate and maintain navigable channels in waterways.
Source: O*NET OnLine, U.S. Department of Labor, used under CC BY 4.0.
Dredge Boat Engineer, Dredge Deckhand, Dredge Engineer, Dredge Hand, Dredge Lever Operator, Dredge Mate, Dredge Operator, Dredge Worker, Dredgemaster, Dredger, Hydraulic Leverman
Let's negotiate the work before we negotiate your leaving date. My opening bid: Move levers to position dredges for excavation, to engage hydraulic pumps, to raise and lower suction booms, and to control rotation of cutterheads. Still on your side of the desk: Move levers to position dredges for excavation, to engage hydraulic pumps, to raise and lower suction booms, and to control rotation of cutterheads.
The difficult handover includes: Move levers to position dredges for excavation, to engage hydraulic pumps, to raise and lower suction booms, and to control rotation of cutterheads. A task that resists automation is useful leverage. Compare it with the work I've put in the first queue.
My first queue includes: Move levers to position dredges for excavation, to engage hydraulic pumps, to raise and lower suction booms, and to control rotation of cutterheads. The full task split below shows what comes next and what I'm leaving behind.
My countdown for this role is 5 years and 2 months. That's the headline number; the task split explains why some of your work reaches my desk before the rest.