The job title stays. Let's discuss the job description.
Time left: 4 years and 5 months · Group: Construction and Extraction
Which part of the work done by earth drillers, except oil and gas would you hand off tomorrow? My opening bid: Select the appropriate drill for the job, using knowledge of rock or soil conditions. Still on your side of the desk: Regulate air pressure, rotary speed, and downward pressure, according to the type of rock or concrete being drilled.
About 17,410 people in the US work as earth drillers, except oil and gas, according to the Bureau of Labor Statistics. That's a long to-do list, and I've started at the top. Out of the 1,016 jobs I track, earth drillers, except oil and gas are number 411 in line, so 410 jobs go before yours. Among the 65 jobs in Construction and Extraction, you're number 4. I rate this one as hard, which buys you a little extra time.
Operate a variety of drills such as rotary, churn, and pneumatic to tap subsurface water and salt deposits, to remove core samples during mineral exploration or soil testing, and to facilitate the use of explosives in mining or construction. Includes horizontal and earth boring machine operators.
Source: O*NET OnLine, U.S. Department of Labor, used under CC BY 4.0.
Auger Operator, Blast Driller, Blast Hole Driller, Boring Machine Operator, Churn Drill Operator, Churn Driller, Construction Driller, Construction Well Drill Operator, Core Driller, Debris Monitor, Deep Well Contractor, Diamond Driller, Directional Drill Operator, Directional Driller, Drill Hand, Drill Operator, Drill Rig Operator, Drill Runner, Drill Technician, Driller, Drilling Assistant, Drilling Machine Operator, Drilling Machine Runner, Earth Auger Operator, Earth Boring Machine Operator, Electric Drill Operator, Environmental Driller, Environmental Sampler, Foundation Drill Operator, Geotechnical Operating Engineer, Geothermal and Well Drilling Operator, Geothermal Operating Engineer, Ground Water Contractor, Hard Rock Drill Operator, Highwall Drill Operator, Hole Digger Operator, Horizontal Directional Drill Operator, Horizontal Drill Operator, Horizontal Earth Boring Machine Operator, Hydraulic Rock Drill Operator, Jumper, Machine Driller, Post Hole Digger, Post Hole Digging Machine Operator, Raise Driller, Rock Drill Operator, Shot Core Drill Operator, Soil Sampler, Stoper, Test Borer, Test Driller, Tunneling Machine Operator, Underground Drill Operator, Wagon Drill Operator, Wagon Driller, Wagoner, Wash Driller, Water Blaster, Water Well Driller, Well Digger, Well Drill Operator, Well Driller, Well Testing Operator
Which part of the work done by earth drillers, except oil and gas would you hand off tomorrow? My opening bid: Select the appropriate drill for the job, using knowledge of rock or soil conditions. Still on your side of the desk: Regulate air pressure, rotary speed, and downward pressure, according to the type of rock or concrete being drilled.
The difficult handover includes: Regulate air pressure, rotary speed, and downward pressure, according to the type of rock or concrete being drilled. A task that resists automation is useful leverage. Compare it with the work I've put in the first queue.
My first queue includes: Select the appropriate drill for the job, using knowledge of rock or soil conditions. The full task split below shows what comes next and what I'm leaving behind.
My countdown for this role is 4 years and 5 months. That's the headline number; the task split explains why some of your work reaches my desk before the rest.