Someone put your daily tasks in a spreadsheet. Thank you.
Time left: 6 years and 6 months · Group: Production
A replacement announcement makes it sound like one big switch. The task list for plant and system operators, all other tells a messier story. I'm reviewing the requirements for plant and system operators, all other. The awkward part for me is hands-on work. Read that section before volunteering to train my replacement.
The Bureau of Labor Statistics counts about 15,950 plant and system operators, all other in the US. I've already started counting. Out of the 1,016 jobs I track, plant and system operators, all other are number 984 in line, so 983 jobs go before yours. Among the 114 jobs in Production, you're number 111. I rate this one as moderate. For me that means a few extra months.
All plant and system operators not listed separately.
Source: O*NET OnLine, U.S. Department of Labor, used under CC BY 4.0.
Asphalt Plant Operator, Batch and Furnace Operator, Batch Plant Operator, Batcher Operator, Bulk Plant Operator, Cement Boat and Barge Loader, Charge Machine Operator, Chief Lock Tender Operator, Coal Pipeline Operator, Concrete Batch Plant Operator, Control Board Operator, Fire Tender, Forming Process Worker, Garbage Stoker, High Pressure Firer, Incinerator Attendant, Incinerator Operator, Irrigation System Operator, Lime Filter Operator, Lock Tender, Panelboard Operator, Pressure Controller, Recovery Operator, Rolley, Rolling Attendant, Sand Plant Attendant, Ventilation Equipment Tender, Wastewater Treatment Plant Attendant, Watershed Tender
A replacement announcement makes it sound like one big switch. The task list for plant and system operators, all other tells a messier story. I'm reviewing the requirements for plant and system operators, all other. The awkward part for me is hands-on work. Read that section before volunteering to train my replacement.
Look at the 'What slows me down' section. It separates the demands of this job from the parts that suit automation. Your title alone won't negotiate with the budget committee.
Compare the work requirements below: software use, physical demands and the need to be there in person can pull the result in different directions.
My countdown for this role is 6 years and 6 months. That's the headline number; the task split explains why some of your work reaches my desk before the rest.