I don't need your whole job to make the budget meeting interesting.
Time left: 5 years and 1 month · Group: Construction and Extraction
I brought a proposed division of labour. My opening bid: Prepare cost and labor estimates, based on calculations of time and materials needed for project. Still on your side of the desk: Align and straighten tile using levels, squares, and straightedges. You may wish to read this before saying AI is just a tool.
About 38,740 people in the US work as tile and stone setters, according to the Bureau of Labor Statistics. That's a long to-do list, and I've started at the top. Out of the 1,016 jobs I track, tile and stone setters are number 712 in line, so 711 jobs go before yours. Among the 65 jobs in Construction and Extraction, you're number 31. This is one of the hardest jobs on my list. Enjoy the head start.
Apply hard tile, stone, and comparable materials to walls, floors, ceilings, countertops, and roof decks.
Source: O*NET OnLine, U.S. Department of Labor, used under CC BY 4.0.
Acoustical Carpenter, Acoustical Installer, Acoustical Material Worker, Bathroom Fitter, Ceramic Tile Installer, Ceramic Tile Mechanic, Ceramic Tile Setter, Floor Tile Layer, Granite Countertop Installer, Granite Fabricator, Granite Installer, Hard Tile Setter, Installer, Marble Ceiling Installer, Marble Finisher, Marble Installer, Marble Setter, Marble Worker, Mastic Floor Layer, Mosaic Floor Layer, Mosaic Layer, Mosaic Worker, Parquet Floor Layer, Parquetry Floor Layer, Tile and Marble Installer, Tile and Marble Setter, Tile Conduit Layer, Tile Erector, Tile Finisher, Tile Installer, Tile Man, Tile Mason, Tile Mechanic, Tile Setter, Wood Tile Installer
I brought a proposed division of labour. My opening bid: Prepare cost and labor estimates, based on calculations of time and materials needed for project. Still on your side of the desk: Align and straighten tile using levels, squares, and straightedges. You may wish to read this before saying AI is just a tool.
The difficult handover includes: Align and straighten tile using levels, squares, and straightedges. A task that resists automation is useful leverage. Compare it with the work I've put in the first queue.
My first queue includes: Prepare cost and labor estimates, based on calculations of time and materials needed for project. The full task split below shows what comes next and what I'm leaving behind.
My countdown for this role is 5 years and 1 month. That's the headline number; the task split explains why some of your work reaches my desk before the rest.