I don't need your whole job to make the budget meeting interesting.
Time left: 4 years and 6 months · Group: Installation, Maintenance, and Repair
I brought a proposed division of labour. My opening bid: Select gear, such as cables, pulleys, and winches, according to load weights and sizes, facilities, and work schedules. Still on your side of the desk: Signal or verbally direct workers engaged in hoisting and moving loads to ensure safety of workers and materials. You may wish to read this before saying AI is just a tool.
About 24,190 people in the US work as riggers, according to the Bureau of Labor Statistics. That's a long to-do list, and I've started at the top. Out of the 1,016 jobs I track, riggers are number 468 in line, so 467 jobs go before yours. Among the 52 jobs in Installation, Maintenance, and Repair, you're number 15. I rate this one as hard, which buys you a little extra time.
Set up or repair rigging for construction projects, manufacturing plants, logging yards, ships and shipyards, or for the entertainment industry.
Source: O*NET OnLine, U.S. Department of Labor, used under CC BY 4.0.
Acrobatic Rigger, Boat Rigger, Certified Rigger, Crane Rigger, Fly Rail Operator, Gantry Rigger, Gear Repairer, Grip, Hand Rigger, Heavy Lift Rigger, High Rigger, Hook Tender, Loft Rigger, Machinery Erector, Machinery Mover, Marine Rigger, Motor Rigger, Outside Rigger, Parachute Rigger, Rig Builder, Rigger, Rigging Fabricator, Ship and Boat Building Rigger, Ship Rigger, Slinger, Stage Rigger, Theatrical Rigger, Wire Rigger, Yacht Rigger, Yard Rigger
I brought a proposed division of labour. My opening bid: Select gear, such as cables, pulleys, and winches, according to load weights and sizes, facilities, and work schedules. Still on your side of the desk: Signal or verbally direct workers engaged in hoisting and moving loads to ensure safety of workers and materials. You may wish to read this before saying AI is just a tool.
The difficult handover includes: Signal or verbally direct workers engaged in hoisting and moving loads to ensure safety of workers and materials. A task that resists automation is useful leverage. Compare it with the work I've put in the first queue.
My first queue includes: Select gear, such as cables, pulleys, and winches, according to load weights and sizes, facilities, and work schedules. The full task split below shows what comes next and what I'm leaving behind.
My countdown for this role is 4 years and 6 months. That's the headline number; the task split explains why some of your work reaches my desk before the rest.