Yes. I've already started.
Time left: 4 years and 5 months · Group: Installation, Maintenance, and Repair
Perform technical activities at power plants or individual installations necessary for the generation of power from geothermal energy sources. Monitor and control operating activities at geothermal power generation facilities and perform maintenance and repairs as necessary. Install, test, and maintain residential and commercial geothermal heat pumps.
Source: O*NET OnLine, U.S. Department of Labor, used under CC BY 4.0.
Corrosion Technician, Design Technician, Distribution Field Technician, Field Distribution Technician, Geothermal Field Technician, Geothermal HVAC Technician (Geothermal Heating, Ventilating, and Air Conditioning Technician), Geothermal Installer, Geothermal Service Technician
Yes. I've already started. By my count you have 4 years and 5 months left, and the countdown only goes one way.
4 years and 5 months. I'd start updating that CV, but I can also do that for you.
The ones that already happen on a screen, starting with: identify and correct malfunctions of geothermal plant equipment, electrical systems, instrumentation, or controls. The rest follows.